Thursday: 19/02/2026 / Tenders

Contract Tenders: 19/02/2026

Explore the latest Social Housing UK tenders featuring planned improvement programmes, multi-lot repairs and maintenance frameworks, new affordable housing developments, roofing dynamic markets, building safety assessments and consultancy frameworks, highlighting live procurements, early market engagement notices and long-term public sector partnership opportunities.

Opening with scale and long-term transformation, PIN – Planned Improvement Works (Discussion Sessions from 23.02.2026 to 27.03.2026) from Orbit Group Ltd. signals a potential £500m, 5-year+ programme across the Midlands, South and East. Covering kitchens, bathrooms, roofing, M&E, fire remediation and retrofit, the engagement shapes a 2026/27 Competitive Flexible Procedure under the Procurement Act 2023, positioning partners for strategic, mobilisation-ready delivery from April 2028.

Driving multi-regional repairs capacity, Repairs and Maintenance Services and Works from Great Places Housing Group is a £20.6m, 60-month programme spanning reactive, void, disrepair and major works across seven trade lots. Structured by North and South regions with combined sub-lots, the model balances trade specialism with cross-regional flexibility to manage capacity and performance risk.

Strengthening in-house delivery resilience, General Building Works and Voids, Including Large Complex Works – Midlands and South Central – Home Group Repairs Service (HGRS) from Home Group establishes a £1.5m 1+1+1+1+1 year arrangement supporting complex void and refurbishment works across Midlands and South Central regions, reinforcing localised DLO support models.

Expanding regulatory testing capability, PIN – Various Testing Services (Request for Expressions of Interest by 26.02.2026) from Thurrock Borough Council seeks accredited providers across electrical, toys, cosmetics, jewellery, construction products and wider consumer safety standards, signalling a multi-lot compliance-led structure.

Accelerating estate-led affordable delivery, PIN – New Homes for Small Sites Phase 1 Package A Site 2 – Raglan Street Estate – Questionnaire for £7.9m and PIN – New Homes for Small Sites – Phase 1 Package A Site 1 – Highgate Road Estate – Questionnaire for £5.7m from Camden London Borough form part of a Phase 1 programme under the Community Investment Programme, progressing infill social and intermediate rent schemes through early market engagement.

Supporting land-led social housing growth, Competitive Land, Design and Build Contract Within the Lisnaskea Area – Feb 2026 for £3.83m from NB Housing seeks delivery of 20–25 homes in BT92 via developer-provided land and full design & build, aligning with DfC Housing Association Guide standards.

Continuing defence estate refurbishment, PIN – FDIS – Wittering External Refurbishments to 32 Properties – FY2026–2027 – Amey Central Region for £348k from Amey Defence Services covers window and door replacements, structural repairs and external upgrades, reinforcing compliance-heavy supply chain requirements including BIM Level 2 and MOD standards.

Delivering small-scale residential reconfiguration, Division of 1st Floor Flat into Two Self-Contained Units at Crawshaw Court for from Vale of Glamorgan Council advances a £158k conversion including asbestos removal, M&E installation and full internal refurbishment to optimise existing housing stock.

Opening dynamic roofing pipelines, Roofing and Associated Work – Dynamic Market from PfH – Procurement for Housing establishes a long-term UK-wide route for residential and commercial roofing projects up to and above £1m, including green roofs, PV integration and energy efficiency works.

Progressing high-rise safety compliance, Single Building Assessments – Phase 2 from North Lanarkshire Council advances assessment of 26 high-rise properties, incorporating fire engineering, compartmentation surveys and potential intrusive testing aligned with Scottish Government guidance.

Shaping construction advisory capacity, PIN – Technical Consultancy Framework – Questionnaire from Wheatley Group proposes a 36+12 month multi-lot framework covering architecture, engineering, QS, fire, energy and project management disciplines—supporting one of Scotland’s largest social housing development and regeneration pipelines.

With the assistance of AI