Thursday: 04/12/2025 / Awards

Contract Awards: 04/12/2025

Explore the latest UK social housing contract awards, featuring a major Bristol disabled adaptations framework alongside London disrepair, voids and damp programmes, ECO4-funded decarbonisation, interim minor works, fire safety and security servicing, PV and ventilation upgrades, electrical testing, asbestos removal and multiple compliance-led contracts driving safer, warmer and more efficient homes nationwide.

Powering inclusive living, Bristol City Council has established a 36‑month Disabled Adaptations Framework worth £16.8m, appointing supply chains including C.L.C. Contractors, D R Jones Yeovil, Hudson Plumbing & Heating Services, Jeff Way Electrical Services, Masters Pipeline Services, Ashcroft Services, Dolphin Lifts (Western), Liftech Solutions and Wessex Lift Co to deliver repairs and minor works, internal conversions, structural adaptations and domestic lift installations to tenanted homes.​

Driving complex repairs and turnaround in London, Hammersmith & Fulham has awarded Cavendish Construction a £4.989m, 24‑month Disrepair and Complex Works call‑off alongside a £945k, 23‑month Planned Voids contract to KBH Building Services, while also appointing Bell Group on a £4.91m, 24‑month Damp and Mould Works call‑off to address moisture issues across social housing stock.

Rooftop Housing Group has let a £1.70m, 28‑month Window and Door Replacement Programme Lot 6 to Anglian Building Products for UPVC window and door supply and install, and Walsall Housing Group has selected Broad Oak Properties for a £4.0m, 24‑month ECO4‑funded Decarbonisation Works contract delivering retrofit assessments and measures such as insulation, heating upgrades and solar PV.​

Supporting responsive delivery in the East Midlands, Rykneld Homes has put in place four 6‑month interim minor works contracts of £250k each with S. & A. Parsons, Integral Concrete Solutions, Mount Building Services and Ven Construction to cover ad hoc construction-related works ahead of a planned framework.

Newcastle City Council continues its door renewal programme via a £94k, 3‑month Supply and Installation of External Doors award to Straightline (NE), while Stonewater has engaged Redbridge & Sons on a £712k, 6‑month commercial boiler replacement at Brain Court in Swindon.​

Targeting energy efficiency improvements, Scottish Borders Council has appointed BCA Insulation on a £305.88k, 7‑month ASHP and CWI scheme to 20 homes plus loft and cavity insulation under ECO-style funding, and Great Places Housing Group has awarded Security and Fire Experts a £3.91m, 60‑month Fire Safety Equipment Testing, Servicing and Maintenance contract across around 900 buildings in the North West and South Yorkshire, and Telford and Wrekin Council has selected Churches Fire Security for a £1.8m, 36‑month Building Security Equipment Tender 2026–2029 to provide 24/7 servicing and response maintenance.​

Strengthening electrical and life-safety compliance, Langstane and Castlehill Housing Associations have jointly procured a £2.00m, 24‑month Electrical Periodic Inspection & Testing contract with RH Electrical Aberdeen, Richard Irvin FM and Hosie Electrical Contracting in Scotland, while Bradford Metropolitan City Council has awarded Salts Fire and Security a £0.80m, 24‑month intruder alarm servicing, maintenance and disconnection contract.

Gentoo Group has appointed Next Gen Eco Solutions for £0.67m over 60 months to deliver Solar PV Services covering maintenance, cleaning, meshing, inspections and solar thermal-to-PV replacements, and Folkestone & Hythe District Council has given Stonegrove a £196.025k, 12‑month Ventilation Upgrades at Cubitt House call‑off via a Fusion21 framework.​

Supporting wider consultancy and specialist works, Wandsworth London Borough has engaged Mand (PLS) on £76k of lift consultancy for multiple blocks; Kirklees Council has called off £250k of rendering works to council properties with Arrow Developments via its DPS.

With the assistance of AI