Friday: 20/02/2026 / Awards

Contract Awards: 20/02/2026

Explore the latest UK social housing contract awards covering Warm Homes retrofit delivery, £9.6m FRA remedial frameworks, fire door and EWI programmes, responsive repairs, district heating metering, asbestos surveys and regeneration consultancy—highlighting compliance, decarbonisation and capital investment across councils and housing associations.

Driving retrofit delivery in the East of England, Warm Homes Scheme – Lot 1 Managing Agent sees East Hertfordshire District Council appoint The National Energy Foundation on a £1.42m, 36-month programme funded by DESNZ, coordinating resident engagement and whole-house retrofit delivery under the Warm Homes: Local Grant.

Reinforcing day-to-day maintenance, Responsive Repairs Services confirms Hastoe Housing Association Ltd. awarding £1.2m over 48 months to NC Range Site, covering Essex, Suffolk and Hertfordshire stock.

Supporting backlog clearance and reactive capacity, Multi-Trade Works – RCH659 sees River Clyde Homes appoint Sureserve Energy Services UK on a £900k, 6-month contract delivering carpentry, electrical, plumbing, roofing and scaffold works across Inverclyde.

Strengthening communal security upgrades, Communal Entrance Doors confirms Orbit Group Ltd. appointing Warrior Doors on an £800k supply and installation programme across the Midlands portfolio.

Delivering hospital discharge adaptations, Minor Works Property Adaptations awards £148k to multiple contractors including Abraham Shaw and Ellis & Colley for Bradford Metropolitan City Council, covering internal adaptations and discharge-led minor works.

Advancing envelope upgrades in Wales, Replacement of Existing Windows and Doors – Beili Glas sees Swansea City and County appoint Ashi Group on a 5-month programme including window and door renewal, gable wall remedials and roof covering replacements.

Scaling compliance investment, Fire Risk Assessment (FRA) Remedial Works confirms dual £9.6m, 36-month awards by Orbit Group Ltd. to CLC Contractors and Bell Group Limited, covering fire doors, compartmentation and fire stopping across regional lots, with extension options.

Supporting development-phase fire protection, Drylining & Firestopping – Boatyard, Bath Road secures a £3.85m award to Stanmore Contractors for Clarion Housing Property Development Services Ltd., integrating screeding, drylining and firestopping works.

Enhancing estate-wide fire door compliance, Supply and Installation of Fire Doors sees Housing Solutions Group appoint Gunfire on a £2.5m, 36-month programme delivering approximately 250 fire doors per annum across Berkshire and Buckinghamshire.

Modernising heat networks, District Heating Metering & Billing Contract confirms a £796k, 48-month award to Switch2 Energy by River Clyde Homes, strengthening billing accuracy and metering oversight.

Providing structural access capability, Scaffolding Assembly & Dismantling Works (Ad-Hoc) sees Nuneaton and Bedworth Borough Council appoint NC Access Solutions on a £250k, 36-month arrangement.

Maintaining statutory asbestos oversight, Asbestos Survey Services – Lot 2 confirms Incommunities Ltd. awarding £100k to Bradley Environmental Consultants under the EN:Procure framework.

Accelerating fabric decarbonisation, External Wall Insulation (EWI) – Lot 27a secures a £2.8m, 36-month contract for CPM Contracts with Vico Homes (formerly WDH), delivering design and installation of EWI systems across Wakefield.

Targeting roof renewals in the East Midlands, Replacement Roof Works sees North Northamptonshire Council appoint Warkton Roofing on a £57k programme covering six residential blocks.

Expanding retrofit advisory services, Domestic Energy Efficiency and Clean Energy Retrofits Service awards £160k to The National Energy Foundation from Hammersmith & Fulham London Borough, delivering end-to-end customer retrofit support.

Strengthening digital resilience, Managed Service for Cyber Security Monitoring & Response confirms a £141k, 36-month award to Phoenix Software by Yorkshire Housing Limited via CCS Cyber Security Services DPS.

Supplementing regional fire works, FRA Works sees Orbit Group Ltd. appoint The London Fire Door & Carpentry Company on a £128k, 4-month programme across South and East portfolios.

Supporting design and regeneration, Architects for the Design and Development of Refurbishment awards £109k to Poynton Bradbury Wynter Cole for Exeter City Council, while Water Lane Regeneration Area – Infrastructure Costing and Delivery Plan secures £94k for Buro Happold.

Strengthening compliance surveying, Fire Risk Assessor – Housing confirms an £86k award by Ipswich Borough Council to Ashby Fire Safety Services, covering FRA services across council stock.

Completing the advisory pipeline, Consultant Team – Tiverton Intervention Strategy sees Mid Devon District Council appoint Cushman & Wakefield (UK) on a £47k multidisciplinary study across three development sites.

With the assistance of AI