{"id":9916,"date":"2026-01-16T12:59:18","date_gmt":"2026-01-16T12:59:18","guid":{"rendered":"https:\/\/www.locarla.com\/insight\/?p=9916"},"modified":"2026-01-16T12:59:18","modified_gmt":"2026-01-16T12:59:18","slug":"friday-16-01-2026-awards","status":"publish","type":"post","link":"https:\/\/www.locarla.com\/insight\/awards\/friday-16-01-2026-awards\/","title":{"rendered":"Friday: 16\/01\/2026 \/ Awards"},"content":{"rendered":"<h6>Contract Awards: 16\/01\/2026<\/h6>\n<p><span style=\"font-weight: 400;\">Explore the latest UK social housing contract awards, featuring Procure Plus\u2019s\u00a0 low and zero carbon technologies framework, plus retrofit call-offs, heating upgrades, electrical compliance, asbestos services, roofing programmes and new-build delivery.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Anchoring the day, Framework for the Installation of Low and Zero Carbon Technologies sees <\/span><b>Procure Plus Holdings Ltd<\/b><span style=\"font-weight: 400;\"> confirm a \u00a31.53bn, 48-month framework supporting retrofit assessment, design and multi-measure installation works. The framework spans ASHPs, GSHPs, electric heating, solar PV, battery storage, insulation and ventilation, with appointed suppliers including British Gas Social Housing, Sureserve Energy Services UK, Equans Regeneration, RE:Gen North East and Kensa Contracting delivering national and regional lots. The programme underpins large-scale decarbonisation while embedding social value, skills and employment outcomes across UK-wide housing stock.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Rolling forward retrofit delivery, Green Homes Initiative \u2013 Phase 6 \u2013 St Annes Road (Call-off) awarded by <\/span><b>Hillingdon London Borough Council <\/b><span style=\"font-weight: 400;\">appoints Greyline Group for \u00a3371k over 12 months, progressing energy efficiency upgrades under its Minor Works Framework in Harefield.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Continuing the same programme, Green Homes Initiative \u2013 Phase 5 \u2013 St Marys Road (Call-off) from <\/span><b>Hillingdon London Borough Council<\/b><span style=\"font-weight: 400;\"> awards Greyline Group \u00a3296k for a further 12-month package focused on retrofit improvements to occupied housing stock.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Extending the rollout, Green Homes Initiative \u2013 Phase 7 \u2013 St Annes Road (Call-off) sees <\/span><b>Hillingdon London Borough Council<\/b><span style=\"font-weight: 400;\"> commit \u00a3240k over 12 months to Greyline Group, reinforcing sustained investment in domestic energy upgrades.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Addressing void turnaround, Empty Home Upgrades (Call-off) awarded by <\/span><b>Gentoo Group Ltd<\/b><span style=\"font-weight: 400;\"> appoints Buston and Maughan for a \u00a3200k, 2-month programme delivering kitchen, bathroom and rewire works via direct award. Supporting property upkeep, Cleaning and Handyman Services from<\/span><b> City of York Council<\/b><span style=\"font-weight: 400;\"> awards JustXhale a \u00a375k, 36-month contract covering ad-hoc repairs, cleaning, moves and garden works across decant, void and selected tenanted homes.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Progressing accessibility adaptations, DFG Extension Works awarded by <\/span><b>Lichfield District Council<\/b><span style=\"font-weight: 400;\"> appoints Tyrer Building Contractors for a \u00a366k, 4-month disabled facilities grant programme. Resolving heating performance risks, Rectification Work to Two Priority Housing Air Source Heat Pump Sites from<\/span><b> Leeds City Council<\/b><span style=\"font-weight: 400;\"> directly awards Clade Engineering Systems \u00a3870k over 4 months to stabilise ASHP systems following contractor insolvency.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Improving in-home heating, Heating System Upgrades \u2013 NPH_2025_42 awarded by <\/span><b>Northamptonshire Partnership Homes<\/b><span style=\"font-weight: 400;\"> secures a \u00a3292k, 3-month programme with Sureserve Compliance Central, British Gas Social Housing, Phoenix Gas Services and Renuvo. Strengthening electrical compliance, Inspection, Testing, Responsive Maintenance, Repairs and Remedial Works on Portable Appliances \u2013 427-NYC-RS (Call-off) from <\/span><b>North Yorkshire Council<\/b><span style=\"font-weight: 400;\"> appoints Norwood Electrical (UK) for \u00a3666k over 24 months via a compliance DPS.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Upgrading vertical transport, Passenger Lift Replacement awarded by <\/span><b>Housing 21 <\/b><span style=\"font-weight: 400;\">appoints Liftworks Lifts for a \u00a3251k, 1-month contract covering specialist residential schemes across multiple regions. Maintaining electrical safety, Electrical Periodic Testing and Remedial Works (Call-off) from <\/span><b>Runnymede Borough Council <\/b><span style=\"font-weight: 400;\">awards T Brown Group \u00a370k over 6 months for statutory testing and repairs.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Driving housing supply, Contractor Design and Construction of New Build Social Housing at Newton Drive \u2013 Lot 4 (Call-off) sees<\/span><b> North Lanarkshire Council <\/b><span style=\"font-weight: 400;\">award McTaggart Construction \u00a38.46m over 22 months for new-build homes and infrastructure in Wishaw. Managing hazardous materials, Asbestos Removal Works through the Asbestos Removals Framework (Call-off) from <\/span><b>Kensington and Chelsea London Borough <\/b><span style=\"font-weight: 400;\">appoints Cablesheer for a \u00a31m, 24-month contract with extension options.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Enhancing risk management, SLH \u2013 Provision of Analytical Management Services \u2013 Lot 1.1 (Call-off) awarded by <\/span><b>City of Doncaster Council <\/b><span style=\"font-weight: 400;\">secures a \u00a3180k, 23-month appointment with Lucion Services covering asbestos, legionella and mould consultancy. Protecting building fabric, Roofing Replacement Program from <\/span><b>Westward Housing Group<\/b><span style=\"font-weight: 400;\"> appoints Bell Group for a \u00a34m, 48-month planned roofing programme.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Supporting regeneration oversight, Whitehill &amp; Bordon Garrison Regeneration \u2013 Monitoring Services awarded by <\/span><b>Homes England<\/b><span style=\"font-weight: 400;\"> appoints Tetra Tech for a \u00a374k, 39-month commission monitoring cost and programme delivery. Rounding out the day, Architectural Services (Call-off) sees <\/span><b>Eildon Housing Association Ltd.<\/b><span style=\"font-weight: 400;\"> appoint Edwards Architecture for \u00a350k over 84 months, supporting a 53-unit new-build development under a direct framework award.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Contract Awards: 16\/01\/2026 Explore the latest UK social housing contract awards, featuring Procure Plus\u2019s\u00a0 low and zero carbon technologies framework, plus retrofit call-offs, heating upgrades, electrical compliance, asbestos services, roofing programmes and new-build delivery. Anchoring the day, Framework for the Installation of Low and Zero Carbon Technologies sees Procure Plus Holdings Ltd confirm a \u00a31.53bn, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[25],"tags":[],"class_list":["post-9916","post","type-post","status-publish","format-standard","hentry","category-awards"],"_links":{"self":[{"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/posts\/9916","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/comments?post=9916"}],"version-history":[{"count":3,"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/posts\/9916\/revisions"}],"predecessor-version":[{"id":9929,"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/posts\/9916\/revisions\/9929"}],"wp:attachment":[{"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/media?parent=9916"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/categories?post=9916"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/tags?post=9916"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}