{"id":9845,"date":"2026-01-09T12:45:06","date_gmt":"2026-01-09T12:45:06","guid":{"rendered":"https:\/\/www.locarla.com\/insight\/?p=9845"},"modified":"2026-01-09T12:45:06","modified_gmt":"2026-01-09T12:45:06","slug":"friday-09-01-2026-tenders","status":"publish","type":"post","link":"https:\/\/www.locarla.com\/insight\/tenders\/friday-09-01-2026-tenders\/","title":{"rendered":"Friday: 09\/01\/2026 \/ Tenders"},"content":{"rendered":"<h6>Contract Tenders: 09\/01\/2026<\/h6>\n<p><span style=\"font-weight: 400;\">Explore the latest Social Housing UK tenders featuring energy efficiency frameworks, retrofits, heat meter installations, minor works lists, new dwellings construction, defence refurbishments, and fire safety upgrades. Essential procurement opportunities for responsive repairs, EPC compliance, and net-zero housing stock projects.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Igniting energy transformation spearheads <\/span><b>Scotland Excel&#8217;<\/b><span style=\"font-weight: 400;\">s PIN &#8211; The Provision of Energy Efficiency Contractors Questionnaire Submission by 03.02.2026 framework at \u00a3800m in Scotland. Multi-lot scope spans architects, insulation, heating systems like heat pumps, and renewables such as solar PV.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u200bAccelerating retrofit ambitions powers <\/span><b>VIVID<\/b><span style=\"font-weight: 400;\">&#8216;s Retrofit Programme PSQ valued at \u00a325m over 36 months in South East and South West. Fabric-first approach targets EPC C for 3,500 homes using internal budgets and potential grants, aligning with net-zero heat goals by 2050.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u200bPrecision metering innovations advance <\/span><b>Newcastle City Council&#8217;<\/b><span style=\"font-weight: 400;\">s PIN &#8211; Heat Meter Installation Works at \u00a32.2m for 13 months in North East. Covers replacements and M-bus systems at St Anns Estate (\u00a31.2m, 258 properties) and Cruddas Park House (\u00a31m, 159 properties) for accurate energy billing.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u200bTailored maintenance responsiveness builds via<\/span><b> Lambeth London Borough<\/b><span style=\"font-weight: 400;\">&#8216;s PIN &#8211; FM Minor Works Supplier List worth \u00a34m across 48 months in Greater London. Divided into Lot 1 (up to \u00a325k) and Lot 2 (\u00a325k-\u00a3250k) for specialist construction on residential properties.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u200bRejuvenating communities thrives with <\/span><b>Swindon Borough Council<\/b><span style=\"font-weight: 400;\">&#8216;s Demolition of Existing Houses and Erection of New Dwellings at Holly and Stuart Close at \u00a31.53m for 12 months in South West. Lots replace fire\/structural damaged semis with accessible M4(2)\/M4(3) units, emphasizing separate site management.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u200bRefurbishing defence assets sharpens <\/span><b>Amey Defence Services<\/b><span style=\"font-weight: 400;\">&#8216; PIN &#8211; FDIS &#8211; External Refurbishments to 2 Properties &#8211; FY202526 &#8211; Amey North Region &#8211; Scotland at \u00a3113k over 3 months. Includes roof replacements, rendering, and electrical works under FDIS RAMS for MoD compliance.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u200bEnhancing fire safety culminates in <\/span><b>Magna Housing<\/b><span style=\"font-weight: 400;\">&#8216;s Bin Store Drying Area Works at Sandringham Court &#8211; MGN202 valued at \u00a365k for 1 month in South West Dorchester sheltered housing. Upgrades communal areas per fire risk assessment for accessibility and compliance.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Contract Tenders: 09\/01\/2026 Explore the latest Social Housing UK tenders featuring energy efficiency frameworks, retrofits, heat meter installations, minor works lists, new dwellings construction, defence refurbishments, and fire safety upgrades. Essential procurement opportunities for responsive repairs, EPC compliance, and net-zero housing stock projects. Igniting energy transformation spearheads Scotland Excel&#8217;s PIN &#8211; The Provision of Energy [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[24],"tags":[],"class_list":["post-9845","post","type-post","status-publish","format-standard","hentry","category-tenders"],"_links":{"self":[{"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/posts\/9845","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/comments?post=9845"}],"version-history":[{"count":2,"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/posts\/9845\/revisions"}],"predecessor-version":[{"id":9853,"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/posts\/9845\/revisions\/9853"}],"wp:attachment":[{"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/media?parent=9845"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/categories?post=9845"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/tags?post=9845"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}