{"id":8651,"date":"2025-08-22T12:35:34","date_gmt":"2025-08-22T12:35:34","guid":{"rendered":"https:\/\/www.locarla.com\/insight\/?p=8651"},"modified":"2025-08-22T12:35:34","modified_gmt":"2025-08-22T12:35:34","slug":"friday-22-08-2025-tenders","status":"publish","type":"post","link":"https:\/\/www.locarla.com\/insight\/tenders\/friday-22-08-2025-tenders\/","title":{"rendered":"Friday: 22\/08\/2025 \/ Tenders"},"content":{"rendered":"<h6>Contract Tenders: 22\/08\/2025<\/h6>\n<p><span style=\"font-weight: 400;\">Growth and renewal drive today\u2019s UK social housing pipeline, with flagship regeneration, high-value frameworks and practical compliance contracts signalling busy order books for 2025\u201326.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Setting the pace, the Chelmer Waterside Residential Development Scheme from <\/span><b>Chelmsford City Council<\/b><span style=\"font-weight: 400;\"> is a \u00a3250m, 71-month procurement opportunity to deliver a residential-led mixed-use scheme of 770\u20131,000 homes with 35% affordable housing, plus demolition, land remediation of a former gasworks, estate management and strong social-value skills and training commitments\u2014an anchor regeneration contract with phased delivery and commercial\/Leisure uses woven into the masterplan.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Building momentum, <\/span><b>Ashfield District Council<\/b><span style=\"font-weight: 400;\"> issues a pipeline PIN \u2013 Fairhaven and Southwell Lane Housing Developments, a \u00a323m, 12-month programme for housing development across the two sites\u2014early engagement for contractors positioned for design, infrastructure, roads, drainage and build-out of new homes.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Innovation in accessibility arrives via <\/span><b>Northern Housing Consortium Ltd.\u2019s<\/b><span style=\"font-weight: 400;\">\u00a0 PIN \u2013 Stairlifts and Lifting Equipment Framework 2026, a UK-wide, 48-month, \u00a3100m framework covering design, supply, installation, servicing and maintenance of stairlifts, hoists, through-floor and platform lifts\u2014supplier engagement sessions precede the formal framework launch.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Disruption on the horizon, <\/span><b>PfH &#8211; Procurement for Housing<\/b><span style=\"font-weight: 400;\"> trails SHED 5 \u2013 Social Housing Emerging Disrupters Framework, a UK-wide, 36-month, \u00a3100m framework to bring innovative goods, works and services to the housing market\u2014an agility-focused route to market for novel retrofit, compliance, asset management and tenant-service solutions.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Inside homes, <\/span><b>Aberdeen City Council<\/b><span style=\"font-weight: 400;\"> publishes Housing Capital Projects \u2013 Internal Works to Houses 2026\u20132030, a \u00a330m, 24-month multi-supplier framework (with extension options) covering kitchens, bathrooms, electrical installations, joinery, floor coverings, decoration and associated making-good across housing stock\u2014call-offs, performance KPIs and community-benefit outcomes central to the contract.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Keeping flows moving, <\/span><b>Ashford Borough Council\u2019s<\/b><span style=\"font-weight: 400;\"> Responsive Drainage Services and Works is a 36-month, \u00a3875k contract for responsive repairs to foul and surface-water systems across varied dwelling types\u2014on-call drainage maintenance and remedial works to protect housing stock.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Safety and assurance take centre stage with <\/span><b>Cornwall Council\u2019s<\/b><span style=\"font-weight: 400;\"> Provision of Security Services to Designated Accommodation Sites, a 36-month contract valued at about \u00a34.09m (with potential extension), delivering SIA-licensed static and mobile patrols, incident response and emergency management across supported accommodation under the Light Touch Regime\u2014compliance, safeguarding and community safety embedded.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Curb-side care, <\/span><b>ClwydAlyn Housing Limited<\/b><span style=\"font-weight: 400;\"> announces a PIN \u2013 Grounds Maintenance Services, a Wales-wide DPS over 24 months worth \u00a31.2m across four lots\u2014grass cutting, hedge works, weed control and hard-landscape maintenance to sustain estate upkeep and resident satisfaction.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Estate resilience planning continues as <\/span><b>Leicester City Council<\/b><span style=\"font-weight: 400;\"> signals Hard FM \u2013 Repairs and Maintenance Framework (PAN3312), a 44-month pre-market engagement (not a call for competition) to scope a future framework for repairs, planned preventative maintenance, installations and compliance across the council estate\u2014suppliers invited to shape specification, asset-management strategy and procurement approach.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Community homes taking shape, <\/span><b>Aster Group\u2019s<\/b><span style=\"font-weight: 400;\"> Design &amp; Build at South Molton CLT is a \u00a312m, 20-month contract to deliver 40 homes for social rent\u2014full design and construction including utilities, adoptable roads, off-site drainage connections, air\/ground-source heat pumps, EV charging, radon mitigation and high-quality public open space.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Modern methods in the spotlight, <\/span><b>Bournemouth, Christchurch and Poole Council<\/b><span style=\"font-weight: 400;\"> runs a PME \u2013 Duck Lane Modular Building Development, a \u00a32m, 12-month scheme for 12 two-bed apartments\u2014off-site modular or panelised solutions targeting Passivhaus principles, with external works, cycle\/bin stores and parking included ahead of a future competitive procurement.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Contract Tenders: 22\/08\/2025 Growth and renewal drive today\u2019s UK social housing pipeline, with flagship regeneration, high-value frameworks and practical compliance contracts signalling busy order books for 2025\u201326. Setting the pace, the Chelmer Waterside Residential Development Scheme from Chelmsford City Council is a \u00a3250m, 71-month procurement opportunity to deliver a residential-led mixed-use scheme of 770\u20131,000 homes [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[24],"tags":[],"class_list":["post-8651","post","type-post","status-publish","format-standard","hentry","category-tenders"],"_links":{"self":[{"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/posts\/8651","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/comments?post=8651"}],"version-history":[{"count":1,"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/posts\/8651\/revisions"}],"predecessor-version":[{"id":8652,"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/posts\/8651\/revisions\/8652"}],"wp:attachment":[{"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/media?parent=8651"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/categories?post=8651"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/tags?post=8651"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}