{"id":13346,"date":"2026-09-25T09:49:55","date_gmt":"2026-09-25T09:49:55","guid":{"rendered":"https:\/\/www.locarla.com\/insight\/?p=13346"},"modified":"2026-09-25T09:49:55","modified_gmt":"2026-09-25T09:49:55","slug":"friday-25-09-2026-awards","status":"publish","type":"post","link":"https:\/\/www.locarla.com\/insight\/awards\/friday-25-09-2026-awards\/","title":{"rendered":"Friday: 25\/09\/2026 \/ Awards"},"content":{"rendered":"<h6>Contract Awards: 25\/09\/2026<\/h6>\n<h6>\n    <link href=\"https:\/\/fonts.googleapis.com\/css2?family=Open+Sans:wght@400;500;600&display=swap\" rel=\"stylesheet\">\n    <div style=\"all:initial; display:flex; align-items:flex-start; gap:10px; background:#f4faf7; border:0.5px solid #b8deca; border-radius:5px; padding:14px 18px; margin-bottom:1rem; box-sizing:border-box; width:100%;\">\n        <div style=\"display:flex; align-items:center; justify-content:center; flex-shrink:0; min-width:28px;margin-top: 1.5px;\">\n            <svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"28\" height=\"28\" viewBox=\"0 0 640 640\"><path fill=\"#498847\" d=\"M224 128C206.3 128 192 142.3 192 160L192 480C192 491.7 188.9 502.6 183.4 512L496 512C522.5 512 544 490.5 544 464L544 160C544 142.3 529.7 128 512 128L224 128zM128 512C145.7 512 160 497.7 160 480L160 160C160 124.7 188.7 96 224 96L512 96C547.3 96 576 124.7 576 160L576 464C576 508.2 540.2 544 496 544L128 544C92.7 544 64 515.3 64 480L64 176C64 167.2 71.2 160 80 160C88.8 160 96 167.2 96 176L96 480C96 497.7 110.3 512 128 512zM416 240C416 231.2 423.2 224 432 224L480 224C488.8 224 496 231.2 496 240C496 248.8 488.8 256 480 256L432 256C423.2 256 416 248.8 416 240zM416 304C416 295.2 423.2 288 432 288L480 288C488.8 288 496 295.2 496 304C496 312.8 488.8 320 480 320L432 320C423.2 320 416 312.8 416 304zM240 368C240 359.2 247.2 352 256 352L480 352C488.8 352 496 359.2 496 368C496 376.8 488.8 384 480 384L256 384C247.2 384 240 376.8 240 368zM240 432C240 423.2 247.2 416 256 416L480 416C488.8 416 496 423.2 496 432C496 440.8 488.8 448 480 448L256 448C247.2 448 240 440.8 240 432zM288 288L352 288L352 224L288 224L288 288zM256 216C256 202.7 266.7 192 280 192L360 192C373.3 192 384 202.7 384 216L384 296C384 309.3 373.3 320 360 320L280 320C266.7 320 256 309.3 256 296L256 216z\"\/><\/svg>\n        <\/div>\n        <div style=\"font-family:'Open Sans', sans-serif; font-size:13px; color:#4c4c4c; font-weight:500; line-height:1.55; flex:1; min-width:0; margin:0; padding:0; white-space:normal; overflow:visible; -webkit-line-clamp:unset; text-overflow:unset;\">New opportunities. New awards. Every day.<br>\n\t\t\t\t\tOur daily Contracts update brings together the latest tenders, contract awards, pipelines and procurement activity from across social housing and the public sector, helping you \t\t\t\t\t\tidentify opportunities, track market movements and stay ahead of the competition.<\/div>\n    <\/div><\/h6>\n<p>Explore the latest UK social housing contract awards featuring repairs and maintenance, planned works, retrofit, lifts, fire safety, refurbishment, new build housing, void management and specialist consultancy services across councils and housing providers.<\/p>\n<p>Minor Works Framework Agreement for Building Maintenance has been awarded by <strong>Pembrokeshire County Council<\/strong> to Cardo (Wales &amp; West), John Weaver (Contractors), R &amp; M Williams (Holdings), R1 Construction, TW Group (South Wales), W.B. Griffiths &amp; Son and Wjg Evans &amp; Sons under a \u00a394.8m, 2-year 8-month framework in Wales. The framework will support maintenance, repairs and improvement works across the council\u2019s 5,864-property housing stock and corporate buildings, covering responsive repairs, void refurbishments, roofing, windows and doors, disabled adaptations, electrical works and planned investment.<\/p>\n<p>Provision of Kitchen Replacements to Council Owned Properties has been awarded by <strong>New Forest District Council<\/strong> to Ian Williams under a \u00a34.22m, 2-year framework in the South East. The appointment will support a programme of kitchen replacements across council-owned residential properties and other buildings, with further work issued according to operational demand and available budgets.<\/p>\n<p>SHF Retrofit Programme Wave 3 Phase 1 has been awarded by <strong>Torus<\/strong> to Next Energy under a \u00a3984k, 3-month contract in the North West. The programme will deliver energy-efficiency improvements to 75 properties across St Helens and Warrington, targeting homes currently below EPC Band C while also addressing minor building condition issues and supporting <strong>Torus<\/strong>\u2019 2030 decarbonisation objectives.<\/p>\n<p>Void Management Services (Electricity and Gas) has been awarded by <strong>Dundee City Council<\/strong> to Helpthemove under a \u00a3154k, 4-year contract in Dundee. The appointment will provide a combined void management and preferred energy supplier service for empty homes and re-lets, helping manage energy services throughout the council\u2019s void housing stock.<\/p>\n<p>Lift Installation, Maintenance and Servicing (Call-off) has been awarded by <strong>Greatwell Homes<\/strong> to Stannah Lift Services under a \u00a3122k, 3-year contract in the East Midlands. The call-off will cover installation, servicing and maintenance of passenger lifts, stairlifts, through-floor lifts and raised platforms across properties owned or managed by <strong>Greatwell Homes<\/strong>, using the EEM0075 framework.<\/p>\n<p>Fire Remediation Works at 35 Lansdowne Square (Call-off) has been awarded by <strong>Dundee City Council<\/strong> to Galliford Try Construction Ltd t\/a Morrison Construction North East under a \u00a3113k, 3-month contract in Scotland. The appointment will deliver emergency fire remediation works at 35 Lansdowne Square.<\/p>\n<p>Heat Network Metering and Billing has been awarded by <strong>Sutton London Borough<\/strong> to Insite Energy under a \u00a330k, 3-year contract in Greater London. The service will provide residents connected to the heat network with monthly bills based on electricity consumption and manage associated payment processing.<\/p>\n<p>Housing Acquisition Programme &#8211; Refurbishment Contractor has been awarded by <strong>Lewisham London Borough<\/strong> to BTS Property Solutions under a \u00a37.2m, 4-year contract in Greater London. The contractor will undertake refurbishment works to homes acquired through the council\u2019s Housing Acquisition Programme, supporting their preparation for housing use.<\/p>\n<p>Construction of Social Housing &#8211; Kerrow Drive has been awarded by <strong>Caledonia Housing Association Ltd<\/strong> to Allan Munro Construction for the construction of social housing at Kerrow Drive in Kingussie. The contract is valued at \u00a34.86m, with the available notice not specifying a contract tenure.<\/p>\n<p>Construction of Social Housing at Dubton Farm Brechin Phase 3B has been awarded by <strong>Caledonia Housing Association Ltd<\/strong> to Scotia Homes for a \u00a33.53m contract in Brechin. The project will deliver new social housing as part of the association\u2019s development programme.<\/p>\n<p>New Build Housing Development at Ruchazie Place, Cranhill has been awarded by <strong>Thenue Housing Association Ltd.<\/strong> to Sim Building Group for a \u00a33m contract in Scotland. The design and build appointment will deliver approximately 12 affordable homes in Glasgow, with the land transfer conditional on the contractor\u2019s appointment.<\/p>\n<p>Asbestos Remedial and Make Safe Works has been awarded by <strong>Harrow London Borough<\/strong> to Solo Asbestos Consultants under a \u00a3100k, 3-month contract in Greater London. The works will cover asbestos removal and disposal, environmental monitoring, ground remediation and urgent health and safety measures, alongside floor tile remediation as part of a wider make-safe programme.<\/p>\n<p>Property Refurbishment to 158 Oxford Road Burnley BB11 3HL has been awarded by <strong>Burnley Borough Council<\/strong> to Mamad Home under a \u00a356k, 3-month contract in Burnley. The refurbishment will cover a range of property improvements including roofing, gutters, external finishes, windows and doors, kitchen extension, plastering and rewiring.<\/p>\n<p>Flooring Works to Low to Mid Rise Communal Areas has been awarded by <strong>Newcastle City Council<\/strong> to Newcastle Flooring Company under a \u00a343k, 1-month contract in Newcastle upon Tyne. The works will supply and install new flooring to communal stairs, landings and lobbies across low- to mid-rise residential buildings.<\/p>\n<p>Small Scale Responsive Roofing Works &#8211; 009487 has been awarded by <strong>Newcastle City Council<\/strong> to Ken Smith Roofing under a \u00a3100k, 1-year contract in the North East. The appointment will provide additional capacity for responsive roofing repairs across the council\u2019s housing stock and other relevant properties in Newcastle upon Tyne.<\/p>\n<p>Fire Engineer &#8211; Hawberry Lodge, 11 North Road has been awarded by <strong>Clarion Housing Group<\/strong> to Global HSE Solutions under a \u00a3118k, 11-month contract in London. The appointment will provide fire engineering support throughout external wall remediation, including design, construction and completion stages and pre- and post-remediation FRAEW services.<\/p>\n<p>Appointment of MEPH Engineer has been awarded by <strong>Peabody Trust<\/strong> to Mendick Waring under an \u00a385k, 10-month contract in Greater London. The appointment will provide mechanical, electrical and public health engineering services for refurbishment works at Chelsea Court.<\/p>\n<p>Station Approach, Dorking &#8211; Energy &amp; Sustainability Consultant has been awarded by <strong>Clarion Regeneration Ltd<\/strong> to Wallace Whittle under a \u00a376k, 3-year 2-month contract in the South East. The consultant will provide energy and sustainability expertise to support the Station Approach development in Dorking.<\/p>\n<p>Canal Capacity Study and Strategy has been awarded by <strong>West Midlands Combined Authority (WMCA)<\/strong> to DK-CM under a \u00a339k, 1-month contract in the West Midlands. The study will assess the potential for canal networks to support additional residential development, including moorings and floating homes, and provide evidence to inform future policy.<\/p>\n<p>Homes England &#8211; Apsley House &amp; Church Lane &#8211; Traffic Surveys has been awarded by <strong>Homes England (HCA)<\/strong> to Ove Arup &amp; Partners under a \u00a326k, 1-month contract in Farington. The appointment will provide highways-related surveys for two Homes England sites, including classified turning counts, queue-length surveys and automatic traffic counts.\n    <div style=\"all:initial; display:flex; align-items:flex-start; gap:10px; background:#f4faf7; border:0.5px solid #b8deca; border-radius:5px; padding:14px 18px;  box-sizing:border-box; width:100%;\">\n        <svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" style=\"flex-shrink:0;margin-top: 1.5px; min-width:28px; width:28px; height:28px;\" viewBox=\"0 0 640 640\"><path fill=\"#498847\" d=\"M320 96C443.7 96 544 196.3 544 320C544 443.7 443.7 544 320 544C196.3 544 96 443.7 96 320C96 196.3 196.3 96 320 96zM320 576C461.4 576 576 461.4 576 320C576 178.6 461.4 64 320 64C178.6 64 64 178.6 64 320C64 461.4 178.6 576 320 576zM272 416C263.2 416 256 423.2 256 432C256 440.8 263.2 448 272 448L368 448C376.8 448 384 440.8 384 432C384 423.2 376.8 416 368 416L336 416L336 304C336 295.2 328.8 288 320 288L272 288C263.2 288 256 295.2 256 304C256 312.8 263.2 320 272 320L304 320L304 416L272 416zM320 248C333.3 248 344 237.3 344 224C344 210.7 333.3 200 320 200C306.7 200 296 210.7 296 224C296 237.3 306.7 248 320 248z\"\/><\/svg>\n        <div style=\"font-family:'Open Sans', sans-serif; font-size:13px; font-weight:500; color:#4c4c4c; line-height:1.55; flex:1; min-width:0; margin:0; padding:0; white-space:normal; overflow:visible; -webkit-line-clamp:unset; text-overflow:unset;\">All information is curated from public sources and market intelligence.<br>Published daily on weekdays.<\/div>\n    <\/div><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Contract Awards: 25\/09\/2026 Explore the latest UK social housing contract awards featuring repairs and maintenance, planned works, retrofit, lifts, fire safety, refurbishment, new build housing, void management and specialist consultancy services across councils and housing providers. Minor Works Framework Agreement for Building Maintenance has been awarded by Pembrokeshire County Council to Cardo (Wales &amp; West), [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[25],"tags":[],"class_list":["post-13346","post","type-post","status-publish","format-standard","hentry","category-awards"],"_links":{"self":[{"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/posts\/13346","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/comments?post=13346"}],"version-history":[{"count":2,"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/posts\/13346\/revisions"}],"predecessor-version":[{"id":13358,"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/posts\/13346\/revisions\/13358"}],"wp:attachment":[{"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/media?parent=13346"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/categories?post=13346"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/tags?post=13346"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}