{"id":10813,"date":"2026-04-27T08:11:35","date_gmt":"2026-04-27T08:11:35","guid":{"rendered":"https:\/\/www.locarla.com\/insight\/?p=10813"},"modified":"2026-04-27T08:11:35","modified_gmt":"2026-04-27T08:11:35","slug":"monday-27-04-2026-awards","status":"publish","type":"post","link":"https:\/\/www.locarla.com\/insight\/awards\/monday-27-04-2026-awards\/","title":{"rendered":"Monday: 27\/04\/2026 \/ Awards"},"content":{"rendered":"<h6>Contract Awards: 27\/04\/2026<\/h6>\n<p><span style=\"font-weight: 400;\">Explore the latest UK social housing contract awards featuring capital investment works, roofing, heating, electrical, adaptations, and architect and surveyor services across housing associations and councils.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Capital Investment Works 2026 to 2046 sees <\/span><b>Southern Housing<\/b><span style=\"font-weight: 400;\"> appoint Amber Construction Services, Architectural Decorators, Axis Europe, Chas Berger, Highview Group, and HLS McConnell under a \u00a31.98bn, 10-year contract to deliver works across 10 operational lots covering external elements including windows, roofs and non-fire doors, and internal elements including kitchens and bathrooms, split on a geographical basis across London, Sussex, Kent and Essex.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">LAS Level Access Showers has been awarded by <\/span><b>Nuneaton and Bedworth Borough Council<\/b><span style=\"font-weight: 400;\"> to Dodd Group (Midlands) under a \u00a33m, 36-month contract, covering level access shower installations within permitted timeframes across properties in the Borough of Nuneaton and Bedworth.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Kitchen and Bathroom Supply and Install Works (Call-off) highlights <\/span><b>North Tyneside Council<\/b><span style=\"font-weight: 400;\"> appointing A. &amp; J. Keith under a \u00a3616k, 12-month contract following a mini competition to deliver kitchen and bathroom supply and installation works.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Riverside Park Estate Phase 1 &#8211; Internal Painting (Call-off) sees <\/span><b>North Tyneside Council<\/b><span style=\"font-weight: 400;\"> appoint Trident Maintenance Services under a \u00a336k, 5-month contract to deliver internal painting works at Riverside Park Estate Phase 1, awarded following a mini competition.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Supply and Installation of Doors as and When Required (Citywide) &#8211; 009462 has been awarded by <\/span><b>Newcastle City Council<\/b><span style=\"font-weight: 400;\"> to Straightline NE under a 4-month contract, covering the replacement of external doors to residential properties across the city.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Boiler Replacement Programme highlights <\/span><b>Vico Homes (formerly WDH)<\/b><span style=\"font-weight: 400;\"> appointing Palm (Yorkshire) under a \u00a33.15m, 36-month contract to deliver a boiler replacement programme across Vico Homes properties in Yorkshire and the Humber and the East Midlands.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">PPM of Gas Fired Boilers and Associated Plant, Including Provision of Call Out and Reactive Repairs sees <\/span><b>Inverclyde Council<\/b><span style=\"font-weight: 400;\"> appoint Valley Group under a \u00a3734k, 2-year contract to supply labour, plant and materials for planned preventative maintenance, annual servicing, and reactive repairs of commercial and domestic gas fired boiler plant and associated equipment.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Riverside Park Estate Phase 1 &#8211; Electrical Works (Call-off) has been awarded by <\/span><b>North Tyneside Council<\/b><span style=\"font-weight: 400;\"> to Capital UK Electrics under a \u00a3248k, 5-month contract, covering electrical works at Riverside Park Estate Phase 1 following a mini competition.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Electricity Points of Connection &#8211; Handforth Garden Village highlights <\/span><b>Cheshire East Council<\/b><span style=\"font-weight: 400;\"> appointing Electricity North West under an \u00a383k, 4-month contract to secure points of connection for an electricity supply to Handforth Garden Village.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Roman Close &#8211; Remediation Works sees <\/span><b>Platform Housing Limited<\/b><span style=\"font-weight: 400;\"> appoint Semilong Services under a \u00a3769k, 3-month contract to undertake specialist remedial works addressing a long-standing design and construction defect affecting several homes at Roman Close, Leintwardine, Herefordshire.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Fencing &amp; Landscaping 2026 &#8211; 2027 &#8211; Lot 40b (Call-off) has been awarded by <\/span><b>Gateshead Metropolitan Borough Council<\/b><span style=\"font-weight: 400;\"> to Deerness and Landscaping Fencing under a \u00a3447k, 12-month contract, covering fencing and landscaping works including responsive repairs, voids and adaptations via the DPS for Construction Contractors.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Empty Property Renovations &#8211; 20367 highlights <\/span><b>Rochdale Metropolitan Borough Council<\/b><span style=\"font-weight: 400;\"> appointing H Bell &amp; Sons (Rochdale) under a \u00a3396k, 5-month contract to renovate empty properties as part of the council&#8217;s statutory housing and homelessness duties to alleviate pressures on affordable housing supply.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Riverside Park Estate Phase 1 &#8211; Flooring (Call-off) sees <\/span><b>North Tyneside Council<\/b><span style=\"font-weight: 400;\"> appoint New Deck Flooring under an \u00a389k, 5-month contract to deliver flooring works at Riverside Park Estate Phase 1, following a mini competition.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Block Roof Replacements v2 highlights <\/span><b>CURO<\/b><span style=\"font-weight: 400;\"> appointing Cade Roofing &amp; Building Services under a \u00a31.41m, 36-month contract to deliver 15 full roof replacements across its housing stock in the South West.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Cornish Mansard Roof Replacements sees <\/span><b>CURO<\/b><span style=\"font-weight: 400;\"> appoint Cade Roofing &amp; Building Services under a \u00a31.41m, 36-month contract to deliver 11 block roof replacements to Cornish Mansard properties as part of a planned programme to manage the condition of roofs across its housing stock.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Chirton Grange Finlock Gutter Props Phase 1 (Call-off) has been awarded by <\/span><b>North Tyneside Council<\/b><span style=\"font-weight: 400;\"> to Springs Roofing under a \u00a3313k, 3-month contract, covering Finlock gutter props works at Chirton Grange Phase 1 following a mini competition.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">18\/20 Archery Road Roofing highlights <\/span><b>Orbit Group Ltd.<\/b><span style=\"font-weight: 400;\"> appointing AD Construction Group under a \u00a331k, 1-month contract covering liquid renewal roofing, localised render repairs, drainage review and minor carpentry and decoration works at 18 and 20 Archery Road.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Non-Traditional Stock Condition Surveys sees <\/span><b>Delta Housing Limited (formerly CHP)<\/b><span style=\"font-weight: 400;\"> appoint Michael Dyson Associates under a \u00a3351k contract to deliver non-traditional structural surveys across its housing stock in East Anglia.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Architectural Design Services &amp; Decarbonisation Retrofit for Dwellings &#8211; CA17681 has been awarded by <\/span><b>Whittington Health<\/b><span style=\"font-weight: 400;\"> to AHP Architects &amp; Surveyors under a \u00a3300k, 32-month contract, covering architectural design services and decarbonisation retrofit works for dwellings across Greater London.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Station Gardens &#8211; Clerk of Works highlights <\/span><b>Rochdale Metropolitan Borough Council<\/b><span style=\"font-weight: 400;\"> appointing Whiteley Eaves under a \u00a363k, 1-year 10-month contract to provide MEP and building clerk of works services for the Station Gardens project, delivering 81 houses on the former central retail park site in Rochdale town centre.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Corner Plot &#8211; Clerk of Works sees <\/span><b>Rochdale Metropolitan Borough Council<\/b><span style=\"font-weight: 400;\"> appoint Whiteley Eaves under a \u00a338k, 11-month contract to provide MEP and building clerk of works services for the Corner Plot project, delivering 33 apartments at a key gateway site outside Rochdale Railway Station.<\/span><\/p>\n<p>Provision of M&amp;E Consultant Services for Norgans Hill has been awarded by <strong>ateb Group Ltd.<\/strong> to Mondes Projects under a \u00a316k, 18-month contract, covering M&amp;E consultancy services for the Norgans Hill development scheme in Pembroke, Pembrokeshire, while Provision of Architect Services for Norgans Hill Development highlights, appointing GWP Architecture under a \u00a312k, 18-month contract to provide architectural services for the same scheme, alongside Provision of Structural Engineer Services for Norgans Hill, Pembroke Development appointed to Roger Casey Associates under a \u00a312k, 18-month contract to deliver structural engineering services supporting the Norgans Hill development in Pembrokeshire.<\/p>\n<p><span style=\"font-weight: 400;\">Heat Network &#8211; Metering and Billing Outsourcing has been awarded by <\/span><b>Plymouth Community Homes<\/b><span style=\"font-weight: 400;\"> to Insite Energy under a \u00a378k, 36-month contract, covering the outsourcing of metering and billing services for the organisation&#8217;s heat networks in the South West.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Contract Awards: 27\/04\/2026 Explore the latest UK social housing contract awards featuring capital investment works, roofing, heating, electrical, adaptations, and architect and surveyor services across housing associations and councils. Capital Investment Works 2026 to 2046 sees Southern Housing appoint Amber Construction Services, Architectural Decorators, Axis Europe, Chas Berger, Highview Group, and HLS McConnell under a [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[25],"tags":[],"class_list":["post-10813","post","type-post","status-publish","format-standard","hentry","category-awards"],"_links":{"self":[{"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/posts\/10813","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/comments?post=10813"}],"version-history":[{"count":2,"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/posts\/10813\/revisions"}],"predecessor-version":[{"id":10819,"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/posts\/10813\/revisions\/10819"}],"wp:attachment":[{"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/media?parent=10813"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/categories?post=10813"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/tags?post=10813"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}