{"id":10693,"date":"2026-04-15T07:51:36","date_gmt":"2026-04-15T07:51:36","guid":{"rendered":"https:\/\/www.locarla.com\/insight\/?p=10693"},"modified":"2026-04-15T07:51:40","modified_gmt":"2026-04-15T07:51:40","slug":"wednesday-15-04-2026-awards","status":"publish","type":"post","link":"https:\/\/www.locarla.com\/insight\/awards\/wednesday-15-04-2026-awards\/","title":{"rendered":"Wednesday: 15\/04\/2026 \/ Awards"},"content":{"rendered":"<h6>Contract Awards: 15\/04\/2026<\/h6>\n<p><span style=\"font-weight: 400;\">Explore the latest UK social housing contract awards featuring fire safety, residential new-build, void refurbishment, central heating, damp and mould, and scaffolding across housing associations and councils.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">74 Coventry Close &#8211; Void Refurbishment Works Include Full Internal Re-Fit, Kitchen, Bathroom, Rewire and Other Works &#8211; SBC0326 sees <\/span><b>Stevenage Borough Council<\/b><span style=\"font-weight: 400;\"> appoint IWL Contractors under a \u00a343k, 3-month contract to deliver full void refurbishment to a three-bedroom house, including new internal walls, ceilings, kitchen, bathroom, WC, full rewire, redecoration and associated works to achieve lettable standard.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Replacement of Heating Systems has been awarded by <\/span><b>The Highland Council<\/b><span style=\"font-weight: 400;\"> to EJ Parker Technical Services (Scotland North) under a \u00a3368k, 2-month contract, covering energy efficiency upgrades in the Inverness area including replacement of heating systems, domestic pipework, and installation of PV panels in selected properties.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Fire Suppression Systems &#8211; Inspection, Servicing, Repairs &amp; Call Outs highlights <\/span><b>The Highland Council<\/b><span style=\"font-weight: 400;\"> appointing G &amp; A Barnie Group under a \u00a3414k, 3-year contract covering inspection, servicing, repairs and call-outs to fire suppression systems installed within business units and associated council-owned buildings across the Highland Council geographical area.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Fire Alarm Installation sees <\/span><b>Kingston upon Thames London Royal Borough<\/b><span style=\"font-weight: 400;\"> appoint Thermoserv under a \u00a3150k, 6-month contract to carry out fire alarm installation works at Sobraon House in Greater London.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Fire Safety and Protection within Housing Portfolio Flatted Accommodation Blocks has been awarded by <\/span><b>Maidstone Borough Council<\/b><span style=\"font-weight: 400;\"> to Sureserve Compliance Fire under a \u00a3140k, 3-year contract, ensuring statutory fire safety compliance and proactive protection across the council&#8217;s housing portfolio of flatted accommodation blocks.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Fire suppression tanks in the Wool Market highlights <\/span><b>City of Doncaster Council<\/b><span style=\"font-weight: 400;\"> appointing Tyco Fire &amp; Integrated Solutions under a \u00a3130k, 3-month contract covering reinstatement works to water tanks feeding the fire suppression system protecting the Wool Market and Corn Exchange buildings.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Green Doctor &#8211; Providing Damp and Mould Reports sees <\/span><b>Bassetlaw District Council<\/b><span style=\"font-weight: 400;\"> appoint Groundwork Five Counties under a \u00a357k, 12-month contract to conduct tenant visits and provide damp and mould reports across the council&#8217;s housing stock.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Melbost West Phases 1&amp;2 &#8211; Tighean Innse Gall has been awarded by <\/span><b>Hebridean Housing Partnership<\/b><span style=\"font-weight: 400;\"> to OMac Construction under a \u00a322.7m, 3-year contract, delivering design and build services for 73 mixed house types across the Melbost West housing development on the Isle of Lewis.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Greenwich Builds, Phase 2, Years 2 and 3, Batch 1 Contractor highlights <\/span><b>Greenwich London Borough<\/b><span style=\"font-weight: 400;\"> appointing Building Associates under an \u00a38.9m, 18-month contract to deliver 28 new residential units across four schemes: Aberford Gardens, Heavitree Close, Southwood Road and Westmount Road.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Design and Build of Affordable Dwellings at Lundy Close sees <\/span><b>Southend-on-Sea Borough Council<\/b><span style=\"font-weight: 400;\"> appoint Auburn Group under a \u00a32.1m contract to carry out design and build of affordable dwellings in line with the proposed 2025 Future Homes Standard, delivered under a JCT Design and Build Contract 2016 Edition.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Two Acre Close &#8211; Major Works Project has been awarded by <\/span><b>Westward Housing Group<\/b><span style=\"font-weight: 400;\"> to Bell Group under a \u00a31m, 9-month contract, appointing a contractor to carry out a major works project at the scheme in accordance with the client specification.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Longbenton Estate Phase 2 &#8211; Structural Works (Call-off) highlights <\/span><b>North Tyneside Council<\/b><span style=\"font-weight: 400;\"> appointing MGM under a \u00a3594k, 2-month contract to deliver structural works as part of a call-off following a mini competition procurement process.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Battlehill Estate Phases 6 &amp; 7 &#8211; Scaffolding for Roof Replacements (Call-off) sees <\/span><b>North Tyneside Council<\/b><span style=\"font-weight: 400;\"> appoint Ingleford Scaffolding under a \u00a3236k, 5-month contract to provide scaffolding in support of roof replacement works across the Battlehill Estate Phases 6 and 7.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Inspection, Servicing, Maintenance and Repairs of Moveable Partitions has been awarded by <\/span><b>North Ayrshire Council<\/b><span style=\"font-weight: 400;\"> to Nationwide Operable Wall Services under a \u00a3150k, 3-year contract, covering annual inspection, servicing, maintenance and repairs of moveable partitions and screens across non-housing properties, sheltered housing units and supported living units.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Chirton Grange Estate Phase 1 &#8211; Scaffolding for Roof Replacements (Call-off) highlights <\/span><b>North Tyneside Council<\/b><span style=\"font-weight: 400;\"> appointing Ingleford Scaffolding under a \u00a3140k, 3-month contract to provide scaffolding in support of roof replacement works at Chirton Grange Estate Phase 1.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Disrepair and Minor Works sees <\/span><b>GreenSquareAccord<\/b><span style=\"font-weight: 400;\"> appoint Wilkins Builders under an \u00a383k, 12-month contract to complete general disrepair works and minor project works identified through GSA surveys across East Midlands, West Midlands, South East and South West locations.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Replacement of the MF Ceilings at Shaftoe and Ewart has been awarded by <\/span><b>Newcastle City Council<\/b><span style=\"font-weight: 400;\"> to K D Building Solutions under a \u00a343k, 6-month contract, replacing metal framework ceilings across two mid-rise residential blocks, Shaftoe and Ewart Court.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Community Energy Programme highlights <\/span><b>East Suffolk Council<\/b><span style=\"font-weight: 400;\"> appointing Centre for Sustainable Energy under a \u00a3179k, 18-month contract to work collaboratively with local communities to identify, develop and implement community-owned renewable energy projects across East Suffolk.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Mechanical and Electrical (M&amp;E) Engineering Consultancy Services for RIBA Stages 3-6 for Cuthbert Harrowing House as Part of the Golden Lane Estate Investment Programme sees <\/span><b>City of London<\/b><span style=\"font-weight: 400;\"> appoint Watkins Payne under a \u00a399k, 60-month contract to deliver M&amp;E engineering consultancy services for RIBA Stages 3 to 6 at Cuthbert Harrowing House.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Colville Estate Phase 2C Design Guardian Services has been awarded by <\/span><b>Hackney London Borough<\/b><span style=\"font-weight: 400;\"> to Karakusevic Carson Architects under an \u00a380k, 12-month contract, providing design guardian advice on contractor design solutions, architectural technical design and sub-contractor proposals throughout the construction phase.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Block Archetyping &#8211; Decarbonisation Framework (Bromley) (Call-off) highlights <\/span><b>Clarion Housing Group<\/b><span style=\"font-weight: 400;\"> appointing Baily Garner under a \u00a329k, 1-month contract to develop a scalable decision framework enabling consistent archetyping of purpose-built blocks and determination of long-term decarbonisation strategies.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">SBC Minor Works, DFG &#8211; 1 Hudeshope Close &#8211; Single Storey Bedroom and Bathroom Extension sees <\/span><b>Stockton-on-Tees Borough Council<\/b><span style=\"font-weight: 400;\"> appoint Vickers Construction to deliver a single-storey bedroom and bathroom extension under a Disabled Facilities Grant-funded minor works programme.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Battlehill Estate Phases 6 &amp; 7 &#8211; Roof Replacements (Call-Off) has been awarded by <\/span><b>North Tyneside Council<\/b><span style=\"font-weight: 400;\"> to Springs Roofing under a \u00a3767k, 5-month contract, delivering roof replacements across Battlehill Estate Phases 6 and 7 following a mini competition call-off process.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Contract Awards: 15\/04\/2026 Explore the latest UK social housing contract awards featuring fire safety, residential new-build, void refurbishment, central heating, damp and mould, and scaffolding across housing associations and councils. 74 Coventry Close &#8211; Void Refurbishment Works Include Full Internal Re-Fit, Kitchen, Bathroom, Rewire and Other Works &#8211; SBC0326 sees Stevenage Borough Council appoint IWL [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[25],"tags":[],"class_list":["post-10693","post","type-post","status-publish","format-standard","hentry","category-awards"],"_links":{"self":[{"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/posts\/10693","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/comments?post=10693"}],"version-history":[{"count":2,"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/posts\/10693\/revisions"}],"predecessor-version":[{"id":10700,"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/posts\/10693\/revisions\/10700"}],"wp:attachment":[{"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/media?parent=10693"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/categories?post=10693"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/tags?post=10693"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}