{"id":10254,"date":"2026-02-25T12:35:18","date_gmt":"2026-02-25T12:35:18","guid":{"rendered":"https:\/\/www.locarla.com\/insight\/?p=10254"},"modified":"2026-02-25T12:35:18","modified_gmt":"2026-02-25T12:35:18","slug":"wednesday-25-02-2026-tenders","status":"publish","type":"post","link":"https:\/\/www.locarla.com\/insight\/tenders\/wednesday-25-02-2026-tenders\/","title":{"rendered":"Wednesday: 25\/02\/2026 \/ Tenders"},"content":{"rendered":"<h6>Contract Tenders: 25\/02\/2026<\/h6>\n<p><span style=\"font-weight: 400;\">Explore the latest Social Housing UK tenders featuring reactive repairs and maintenance, district heating and water term contracts, stairlift and hoist servicing, structural remediation works, grounds maintenance, specialist M&amp;E upgrades, and multi-million pound architectural frameworks supporting new build housing across councils and housing associations.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Re-procuring its core responsive service, <\/span><b>Reactive Building Repairs and Maintenance<\/b><span style=\"font-weight: 400;\"> from <\/span><b>Breckland District Council <\/b><span style=\"font-weight: 400;\">establishes a \u00a3145k, 12-month, quality-weighted (60\/40) contract covering commercial and residential assets across Norfolk\u2019s dispersed rural portfolio. The scope spans day-to-day urgent and emergency repairs, from fabric and roofing to minor plumbing and groundworks, reinforcing estate-wide operational resilience.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Testing the aids and adaptations market, <\/span><b>PIN &#8211; Stairlifts and Lifts Hoists &#8211; Aids and Adaptations &#8211; P3411 ME<\/b><span style=\"font-weight: 400;\"> from <\/span><b>Birmingham City Council <\/b><span style=\"font-weight: 400;\">signals a 3+1+1 year TAC-1 alliance model for inspection, servicing and repair of stairlifts, hoists, assisted bathrooms and specialist equipment. The engagement shapes a long-term compliance route for lifting assets across supported housing environments.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Advancing borough-wide energy infrastructure, <\/span><b>PIN &#8211; Heating &amp; Water Term Contracts for Repairs &amp; Maintenance (Final Market Event Webinar on 12.03.2026)<\/b><span style=\"font-weight: 400;\"> from <\/span><b>Southwark Council <\/b><span style=\"font-weight: 400;\">outlines a \u00a3150m, up to 10-year programme covering district heating, BEMS, cold water services and temporary boiler installations. Structured across north and south regions, the pipeline embeds climate action, resident wellbeing and collaborative delivery.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Targeting plant modernisation in specialist accommodation, <\/span><b>Services Upgrade Works (Phase 1), Adam Grossert Court &#8211; 5204 &#8211; Brownriggs<\/b><span style=\"font-weight: 400;\"> from <\/span><b>Cairn Housing Association Ltd<\/b><span style=\"font-weight: 400;\"> delivers a \u00a3250k focused 3-month upgrade of LTHW heating, domestic water and BMS controls within a residential care facility\u2014balancing 60\/40 price-quality weighting.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Establishing a term maintenance vehicle, <\/span><b>Automatic Door, Roller Shutter and Blinds. Planned and Reactive Maintenance Framework<\/b><span style=\"font-weight: 400;\"> across all WCBC Building Stock from <\/span><b>Wrexham County Borough Council<\/b><span style=\"font-weight: 400;\"> introduces a \u00a3300k 24-month, multi-contractor JCT Framework (2024) covering planned, reactive and ad-hoc installations across civic and housing assets.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Embedding estate presentation standards, <\/span><b>Grounds and Gardens Maintenance (Site Visit on 09.03.2026)<\/b><span style=\"font-weight: 400;\"> from <\/span><b>Newlon Housing Trust<\/b><span style=\"font-weight: 400;\"> is a \u00a3352k, 36-month contract reinforcing environmental upkeep across London housing stock, with structured site engagement and 60\/40 evaluation criteria.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Strengthening structural remediation capability,<\/span><b> Lintels, Helibeams and Wall Ties Works<\/b><span style=\"font-weight: 400;\"> from <\/span><b>Vico Homes (formerly WDH)<\/b><span style=\"font-weight: 400;\"> is a \u00a33.33m, 36-month programme requiring Helifix accreditation and WTIF\/PCA membership\u2014embedding BRE-compliant structural repair standards and long-term warranties across the Wakefield district.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Scaling professional consultancy capacity, <\/span><b>Framework Agreement for the Provision of Architectural Services<\/b> <b>for New Build Housing<\/b><span style=\"font-weight: 400;\"> from <\/span><b>Link Group Ltd<\/b><span style=\"font-weight: 400;\"> establishes a \u00a350m, four-year multi-practice framework supporting affordable housing delivery across Scotland. With RIBA\/RIAS and ARB registration prerequisites and 70\/30 quality-price weighting, the framework underpins new build, rehabilitation and mixed-tenure residential growth.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Contract Tenders: 25\/02\/2026 Explore the latest Social Housing UK tenders featuring reactive repairs and maintenance, district heating and water term contracts, stairlift and hoist servicing, structural remediation works, grounds maintenance, specialist M&amp;E upgrades, and multi-million pound architectural frameworks supporting new build housing across councils and housing associations. Re-procuring its core responsive service, Reactive Building Repairs [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[24],"tags":[],"class_list":["post-10254","post","type-post","status-publish","format-standard","hentry","category-tenders"],"_links":{"self":[{"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/posts\/10254","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/comments?post=10254"}],"version-history":[{"count":2,"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/posts\/10254\/revisions"}],"predecessor-version":[{"id":10260,"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/posts\/10254\/revisions\/10260"}],"wp:attachment":[{"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/media?parent=10254"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/categories?post=10254"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/tags?post=10254"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}