{"id":10172,"date":"2026-02-19T12:30:54","date_gmt":"2026-02-19T12:30:54","guid":{"rendered":"https:\/\/www.locarla.com\/insight\/?p=10172"},"modified":"2026-02-19T12:30:54","modified_gmt":"2026-02-19T12:30:54","slug":"thursday-19-02-2026-tenders","status":"publish","type":"post","link":"https:\/\/www.locarla.com\/insight\/tenders\/thursday-19-02-2026-tenders\/","title":{"rendered":"Thursday: 19\/02\/2026 \/ Tenders"},"content":{"rendered":"<h6>Contract Tenders: 19\/02\/2026<\/h6>\n<p><span style=\"font-weight: 400;\">Explore the latest Social Housing UK tenders featuring planned improvement programmes, multi-lot repairs and maintenance frameworks, new affordable housing developments, roofing dynamic markets, building safety assessments and consultancy frameworks, highlighting live procurements, early market engagement notices and long-term public sector partnership opportunities.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Opening with scale and long-term transformation, PIN &#8211; Planned Improvement Works (Discussion Sessions from 23.02.2026 to 27.03.2026) from<\/span><b> Orbit Group Ltd.<\/b><span style=\"font-weight: 400;\"> signals a potential \u00a3500m, 5-year+ programme across the Midlands, South and East. Covering kitchens, bathrooms, roofing, M&amp;E, fire remediation and retrofit, the engagement shapes a 2026\/27 Competitive Flexible Procedure under the Procurement Act 2023, positioning partners for strategic, mobilisation-ready delivery from April 2028.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Driving multi-regional repairs capacity, Repairs and Maintenance Services and Works from <\/span><b>Great Places Housing Group<\/b><span style=\"font-weight: 400;\"> is a \u00a320.6m, 60-month programme spanning reactive, void, disrepair and major works across seven trade lots. Structured by North and South regions with combined sub-lots, the model balances trade specialism with cross-regional flexibility to manage capacity and performance risk.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Strengthening in-house delivery resilience, General Building Works and Voids, Including Large Complex Works &#8211; Midlands and South Central &#8211; Home Group Repairs Service (HGRS) from <\/span><b>Home Group<\/b><span style=\"font-weight: 400;\"> establishes a \u00a31.5m 1+1+1+1+1 year arrangement supporting complex void and refurbishment works across Midlands and South Central regions, reinforcing localised DLO support models.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Expanding regulatory testing capability, PIN &#8211; Various Testing Services (Request for Expressions of Interest by 26.02.2026) from <\/span><b>Thurrock Borough Council<\/b><span style=\"font-weight: 400;\"> seeks accredited providers across electrical, toys, cosmetics, jewellery, construction products and wider consumer safety standards, signalling a multi-lot compliance-led structure.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Accelerating estate-led affordable delivery, PIN &#8211; New Homes for Small Sites Phase 1 Package A Site 2 &#8211; Raglan Street Estate &#8211; Questionnaire for \u00a37.9m and PIN &#8211; New Homes for Small Sites &#8211; Phase 1 Package A Site 1 &#8211; Highgate Road Estate &#8211; Questionnaire for \u00a35.7m from <\/span><b>Camden London Borough<\/b><span style=\"font-weight: 400;\"> form part of a Phase 1 programme under the Community Investment Programme, progressing infill social and intermediate rent schemes through early market engagement.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Supporting land-led social housing growth, Competitive Land, Design and Build Contract Within the Lisnaskea Area &#8211; Feb 2026 for \u00a33.83m from <\/span><b>NB Housing<\/b><span style=\"font-weight: 400;\"> seeks delivery of 20\u201325 homes in BT92 via developer-provided land and full design &amp; build, aligning with DfC Housing Association Guide standards.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Continuing defence estate refurbishment, PIN &#8211; FDIS &#8211; Wittering External Refurbishments to 32 Properties &#8211; FY2026\u20132027 &#8211; Amey Central Region for \u00a3348k from Amey Defence Services covers window and door replacements, structural repairs and external upgrades, reinforcing compliance-heavy supply chain requirements including BIM Level 2 and MOD standards.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Delivering small-scale residential reconfiguration, Division of 1st Floor Flat into Two Self-Contained Units at Crawshaw Court for from <\/span><b>Vale of Glamorgan Council <\/b><span style=\"font-weight: 400;\">advances a \u00a3158k conversion including asbestos removal, M&amp;E installation and full internal refurbishment to optimise existing housing stock.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Opening dynamic roofing pipelines, Roofing and Associated Work &#8211; Dynamic Market from <\/span><b>PfH &#8211; Procurement for Housing<\/b><span style=\"font-weight: 400;\"> establishes a long-term UK-wide route for residential and commercial roofing projects up to and above \u00a31m, including green roofs, PV integration and energy efficiency works.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Progressing high-rise safety compliance, Single Building Assessments &#8211; Phase 2 from <\/span><b>North Lanarkshire Council <\/b><span style=\"font-weight: 400;\">advances assessment of 26 high-rise properties, incorporating fire engineering, compartmentation surveys and potential intrusive testing aligned with Scottish Government guidance.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Shaping construction advisory capacity, PIN &#8211; Technical Consultancy Framework &#8211; Questionnaire from <\/span><b>Wheatley Group<\/b><span style=\"font-weight: 400;\"> proposes a 36+12 month multi-lot framework covering architecture, engineering, QS, fire, energy and project management disciplines\u2014supporting one of Scotland\u2019s largest social housing development and regeneration pipelines.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Contract Tenders: 19\/02\/2026 Explore the latest Social Housing UK tenders featuring planned improvement programmes, multi-lot repairs and maintenance frameworks, new affordable housing developments, roofing dynamic markets, building safety assessments and consultancy frameworks, highlighting live procurements, early market engagement notices and long-term public sector partnership opportunities. Opening with scale and long-term transformation, PIN &#8211; Planned Improvement [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[24],"tags":[],"class_list":["post-10172","post","type-post","status-publish","format-standard","hentry","category-tenders"],"_links":{"self":[{"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/posts\/10172","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/comments?post=10172"}],"version-history":[{"count":2,"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/posts\/10172\/revisions"}],"predecessor-version":[{"id":10204,"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/posts\/10172\/revisions\/10204"}],"wp:attachment":[{"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/media?parent=10172"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/categories?post=10172"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.locarla.com\/insight\/wp-json\/wp\/v2\/tags?post=10172"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}